Prework - Ops 301 Setup Your Lab Environment

This is the mandatory pre-work for Ops 301. When this course nears its start date, you will be invited to our online class portal, called Canvas, where you can confirm that you’ve completed this pre-work and claim credit.

Start on the pre-work as soon as you can and be sure to allow yourself plenty of time to complete it.

Note: All pre-work is due before start of first class

Part 1: Computer Hardware Requirements

In Ops 301, we will continue using your lab kit PC to host VirtualBox. Your lab computer must meet at least the minimum requirements outlined below, and preferably the optimal requirements.

Minimum System Specifications

Optimal System Specifications

In your submission for this assignment, provide screenshots indicating that the system specifications above are met or exceeded, to receive credit for this part of the assignment.

Submission Instructions

  1. Create a new blank Google Doc.
  2. Populate the Google Doc with the contents of your submission as required above.
  3. Name the document according to your course code and assignment.
    • i.e. seattle-ops-201d1: Reading 01 or seattle-ops-201d1: Lab 04.
  4. Add your name & date at the top of the Google Doc.
  5. Share your Google Doc so that “Anyone with the link can view”.
  6. Paste the link to your Google Doc in the discussion field below and share an observation from your experience in this lab.